Get personal help with your studies from any of the 45,000 experienced experts on Studybay

  • No intermediaries
  • No plagiarism
  • Any Subject
  • Always on time

Here’s an example of project completed by our experts:

Building Construction, Building Planning, Case Study of Hong Kong or Macau Project (Example)

Document Preview:

BUILDING PLANNING IN HONG KONG: A CASE STUDY OF THE ADOPTION OF PREFABRICATED CONSTRUCTION OF BUILDINGS FOR RESIDENTIAL HOUSING PROJECTS. Student’s Name Institutional Affiliation Date BUILDING CONSTRUCTION IN HONG KONG: A CASE STUDY OF THE ADOPTION OF PREFABRICATED CONSTRUCTION OF BUILDINGS FOR RESIDENTIAL HOUSING PROJECTS. Introduction Prefabrication has been widely utilized for many decades in the world. Its main components are pre-assembly modularization as well as prefabrication are some of the principal terms that are used to describe the processes in which the manufacturing buildings are either constructed off-site or on-site by the factory that is used in the manufacture of the pre-engineered systems. Although these terms are sometimes used interchangeably their definition solely lies on the users of these terms regarding their experience as well as understanding which can be said to vary in different countries. However in this paper the term prefabrication will be taken to mean Building Technology. Vol. 1. pp399-403 Hong Kong. Wong W. M. (2000). “Prefabricated Construction in Hong Kong” Issue No.3 Construction & Contract News. Hong Kong Yeung N. S. Y. Chan P.C.& Chan D. W. M. (2002) “Application of prefabrication in construction – a new research agenda for reform by CII-HK” Conference on Precast Concrete Building System. Hong Kong. HKHA report (2000) Quality Housing: Partnering for Change. Hong Kong government printer Jaillon L. & Poon C. (2009). The evolution of prefabricated residential building systems in Hong Kong: A review of the public and the private sector. Automation In Construction 18(3) 239-248. dx.doi.org K. D. and Yau S. K. (1999). “Public Housing Construction in Hong Kong: From Building Traditionally to the Era of Rationalization” Group Proceedings Group 1 – Construction HKIE November 1999. Wong R. Hao J. & Ho C. (2018). Prefabricated Building Construction Systems Adopted in Hong Kong. Retrieved from https://www.researchgate.net/publication/265071247_Prefabricated_Building_Construction_Systems_Adopted_in_Hong_Kong [...]

Order Description:

2 assignment, each assignment 3500 words, with photo and graph, must be Hong Kong or Macau project

Subject Area: Construction

Document Type: Dissertation

This project has already been completed by one of the Studybay experts. The client rated this project:

Project's rating is 5/5

Price $170

Words 8525

Pages 31

Completed in 26 days

Expert Stephen M

Client Review

Good writer

Positive
03.20.2018

Need Help With a Project on This or Another Topic?

Cooperate with seasoned experts directly — create your project now and start getting help in 2 minutes.

Studybay top experts

Reviews from Studybay Community

  • Our Studybay rating is:
    4.9
  • Our ReviewCentre rating is:
    4.8
  • Our SiteJabber rating is:
    4.5