Get personal help with your studies from any of the 45,000 experienced experts on Studybay

  • No intermediaries
  • No plagiarism
  • Any Subject
  • Always on time

Here’s an example of project completed by our experts:

Control chart (Example)

Document Preview:

Fox Island Wind Project Report Name Instructor Affiliate Institution Date Project Summary The Fox Island Wind Project Testing phase was conducted and data collected and analyzed as described below. The data was collected in a period of 10 days with and a record made 5 times per day. The subsequent results were analyzed using Minitab control chart tools. The detailed processes analysis techniques and data collected is discussed in details. At the end of the testing phase a relevant advice is given based on the charts visualization. Q1: Control Chart for Process Variability (Within Sample variation) R-(Range) Chart. This chart displays the range within the sample variation within a sub group. The subgroups analyzed were ten and the variation between subgroups. Q6: Recommendations (Advice) References Appendix 4: Tests for Evidence of Special Causes on Minitab Control Charts. (2011). Six Sigma Quality Improvement with Minitab 491-492. Control Charts II: Means and Ranges. (2012). Industrial Statistics with Minitab 198-203. Henderson  G. R. (2013). Six sigma quality improvement with minitab. Hoboken NJ: Wiley. Khan  R. M. (2013). Problem solving and data analysis using Minitab: A clear and easy guide to six sigma methodology. Mitra  A. (n.d.). STATISTICAL PROCESS CONTROL USING CONTROL CHARTS. Encyclopedia of Production and Manufacturing Management 720-736. Using control charts to detect common-cause variation and special-cause variation - Minitab Express. (n.d.). Retrieved from support.minitab.com Working with subgroups in variables control charts - Minitab. (n.d.). Retrieved from https://support.minitab.com/en-us/minitab/18/help-and-how-to/quality-and-process-improvement/control-charts/supporting-topics/data/working-with-subgroups-in-variables-control-charts/ [...]

Order Description:

You are a quality manager working on the Fox Island Wind Project. The project is now at the testing phase and will be handed over to operations soon. As a quality manager, you want to ensure that the electric power generation process is in control. For ten consecutive days, 5 times a day, you read the meter at specific times throughout the day to measure the output of the power plant. These data are stored in the attached Minitab worksheet. You will use the data and a Word document to answer the following questions:

Subject Area: Project Management

Document Type: Reports

This project has already been completed by one of the Studybay experts. The client rated this project:

Project's rating is 5/5

Price $70

Words 550

Pages 2

Completed in 1 day

Expert Julius M

Client Review

professional and she read the instruction carefully and the assignemnt is amazing!!

Positive
02.17.2018

Similar projects

Need Help With a Project on This or Another Topic?

Cooperate with seasoned experts directly — create your project now and start getting help in 2 minutes.

Studybay top experts

Reviews from Studybay Community

  • Our Studybay rating is:
    4.9
  • Our ReviewCentre rating is:
    4.8
  • Our SiteJabber rating is:
    4.5