Get personal help with your studies from any of the 45,000 experienced experts on Studybay

  • No intermediaries
  • No plagiarism
  • Any Subject
  • Always on time

Here’s an example of project completed by our experts:

Project Management, Statement of Work outlining the projects goals and narrative (Example)

Document Preview:

Student Name Instructor’s Name Course Date Statement of Work Narrative for Fabec Builders Fabec Builders has been a conglomerate developed in 1996 to with a main purpose of utilizing land for commercial purposes. The company has spent years developing low income houses that suit the middle class level of the population with a target to minimize the level of homeless individuals in the nation. The company owns a vast coon for technical devices that help it in its excavation marking and building of the houses. There is limited contact with exterior contractors in the process of building. This is because of the diverse collection of technological devices that are utilized in the field such as compressors trucks excavators just to mention a few However in the administration of the the construction site before commencing on the project. In addition to this the inspection team will be require to use these schematics to carry out a comparative analysis of the units built. Constraints Budget- The site needs to maintain the expenditure of the site to a minimum without compromising on quality to ensure that the site is capable of gaining profits. Time- The project has to remain within the schedule placed at the beginning of the project to minimize the effect of delay and the additional cost to labor and any overhead. Safety-The buildings designed should be in the same regulation as instructed by the resident safety board. In addition to this during construction there has to be a periodic inspection of the safety standard to prevent substandard work. [...]

Order Description:

Develop a Project Management Statement of Work (for building a house) by outlining by the narrative and goals of the project separately at least one page each. The goals must include the six areas from the attached page 73.. The narrative's example is page 72 #1) must be for building a house it must include 3.1 Project selection page 78-79. . The assignment is due on October 29, 2017 NLT 8:00 pm EST.

Subject Area: Project Management

Document Type: Paraphrasing

This project has already been completed by one of the Studybay experts. The client rated this project:

Project's rating is 5/5

Price $25

Words 825

Pages 3

Completed in 9 days

Expert Isaac1

Client Review

Good job

Positive
11.05.2017

Similar projects

Subject of the project is Project Management   Type of the project is Paraphrasing

Project Mgmt Week 3

Subject of the project is Project Management   Type of the project is Paraphrasing

Project Management Discussion

Need Help With a Project on This or Another Topic?

Cooperate with seasoned experts directly — create your project now and start getting help in 2 minutes.

Money-Back Guarantee

Support 24/7

No Hidden Charges

Studybay top experts

Reviews from Studybay Community

  • Our Studybay rating is:
    4.9
  • Our ReviewCentre rating is:
    4.8
  • Our SiteJabber rating is:
    4.5