Royal Institute Of Uk Architects Work Plan Stages

The RIBA Plan of Work describes the actions from appraising the client's requirements through to post structure. The phases are also found in the session of architects and help to identify consultant services and signify the resource and charge total by Work Level.

The information below is in accordance with CABE guidelines (Creating Excellent Buildings: Helpful information for clients, 2003, CABE and Being involved in University Design, 2004, CABE)) and the RIBA Plan of Work.

The selection of procurement course has a simple influence on how different Work Periods proceed. That is summarised in put together as far as possible however the exact way in which different Periods are conducted within the overall project program needs careful consideration first. It is worth noting that the RIBA Plan of Work was at first developed to represent the needs of Traditional contract forms. The next development of substitute contract varieties such as PFI, BSF and partnered contracts means that RIBA Periods don't necessarily fit specifically with discrete levels in these different contract forms. The Achieving Brilliance in Engineering Procurement guide 11 Sustainability recognizes the intervention factors for larger programmes such as BSF including PFI. See www. ogc. gov. uk.

Any project needs a vision and key performance indications to be recognized up front. They should be evaluated at each stage to monitor achievements and check that they are still appropriate. To get a project that wants to combine sustainability in all aspects of a job this is even more important, as for many clients it will involve some changes to classic methods and new means of working need strong management support if they are to be efficiently integrated. KPIs should be recognized in the first project stages for the whole of the Prepare, Design, Construct and Use cycle.

RIBA Work Stage (Common name)

People

involved

Purpose of work and decisions needed

Tasks to be undertaken

PREPARATION

RIBA Level A Appraisal

(Briefing)

All client pursuits, architect/

lead custom (depending on procurement path)

Identification of Client's requirements and any possible constraints on development. Preparation of studies to allow the Client to choose whether to continue and to choose the probable procurement method. The latter is an especially important decision, as it'll determine how project resources, duties and hazards are apportioned between your Client and its own consultants and companies.

Set up project steering group or comparable and identify the eye-sight and key performance indications (KPIs) for the job.

Consider financing and procurement option- BSF, Academy, DfES bet, LEA resources, institution, other organizations.

Traditional contract:

Submit funding bet to DfES

Appoint Design Team

PFI/BSF contract:

Prepare option appraisals

Submit put together business circumstance (OBC)

Obtain OBC approval

Fix cover project

Advertise in OJEU

Partnering deal:

Advertise for and select partnering contractor

Develop structure with client and contractor to ascertain budget

Appoint design advisor, education expert and design champion.

Set up Client company for briefing

RIBA Stage B Preparing Strategic Brief

Client's reps, consortium/

partnering team members, architects, technicians and QS according to the character of the job.

Preparation of general format of requirements and planning of future action with respect to, the client with client confirming key requirements and constraints. Recognition of methods, organisational structure and selection of consultants yet others to be engaged for the project. The strategic short is a key output from this stage and becomes the clear responsibility of your client.

Studies of individual requirements, site conditions, planning, design and cost etc, as essential to reach decisions

Monitor performance against the eye-sight and KPIs for the task.

LEA prepares accommodation schedules in appointment with schools.

Traditional contract:

Sketch design proposals

Cost check against budget

Prepare final specific brief.

PFI/BSF deal:

Select shortlist of bidders.

Prepare ITN and issue to bidders

Receive bids from bidders

Evaluate test designs (BSF)

Evaluate and select Preferred Bidder

Partnering deal:

Decide Partnering Program (workshops etc. )

Cost check against budget

DESIGN

RIBA Level C

Outline proposals

Stage C starts when the architect's short has been determined in sufficient detail

(Sketch plans)

All client passions, consortium/

partnering team members, architects, technicians, QS and specialists are essential.

Provide your client with an appraisal and recommendation so that they may determine the proper execution in which the project is to proceed. Make sure that it is feasible functionally, technically and financially. At this time the introduction of the strategic short in to the full project short begins and put together design proposals and cost estimations are ready.

Develop the simple further.

Do studies on consumer requirements, complex aspects, planning, design and costs as essential to reach decisions.

Monitor performance up against the vision and KPIs for the project.

Traditional deal:

C to F - Complete design and sensitive documentation produced

PFI/BSF deal:

C to F - Negotiations with preferred Bidder to finalise agreement details.

Non test designs prepared in BSF

Partnering agreement:

C to F - Final design developed jointly within budget constraints, most likely to a Agreed Maximum Price (AMP).

The Brief should not be modified substantially following this point. Depending on the procurement way, changes after this level can incur additional expense or extend the programme.

DESIGN

RIBA Level D

Scheme Design &Planning; Detailed Proposals; Submit Planning Application

(Planning drawings)

All client pursuits, architects, engineers, QS and specialists and everything statutory and other approving regulators, builder (if appointed).

Determines the general approach to the layout, design and development in order to obtain authoritative agreement of the client on the format proposals. The task simple will be completely developed and detailed proposals will be produced and put together, generally in a "Stage D" article. The application form for full development control endorsement will be made at this point.

Complete last development short and full design of the project by the architect.

Engineers prepare primary design.

Preparation of cost plan and full explanatory statement.

Submit proposals for many approvals.

Monitor performance from the perspective and KPIs for the project.

Traditional contract:

C to F - Detailed design and sensitive documentation produced

PFI/BSF deal:

C to F - Discussions with preferred Bidder to finalise agreement details.

Non sample designs prepared in BSF

Partnering contract:

C to F - Last design developed jointly within budget constraints, probably with an Agreed Maximum Price (AMP).

DESIGN

RIBA Stage E

Detail Design; Last proposals.

All client hobbies, architects, engineers, QS and specialists and everything statutory and other approving specialists, contractor

(if appointed).

Completion of the simple with decisions made on the look arrangement, appearance, development method, outline specs and cost of the job. All approvals will be obtained at this stage, including for Building Polices.

In effect, during this Stage final proposals are developed for the Project sufficient for co-ordination of most its components and elements to appreciate the engineering.

Full design of every part and element of the building by cooperation of all concerned. Complete cost checking of designs.

Monitor performance against the eyesight and KPIs for the project.

Traditional deal:

C to F - Detailed design and sensitive documentation produced

PFI/BSF agreement:

C to F - Discussions with preferred Bidder to finalise deal details.

Non sample designs well prepared in BSF

Partnering contract:

C to F - Last design developed jointly within budget constraints most likely with an Agreed Maximum Price (AMP).

Any further change in location, size, shape, engineering method or cost after that time will probably result in abortive work. Some procurement methods makes it easier and less costly to make changes following this Stage.

DESIGN

RIBA Stage F

Production information

Architects, QS, technicians and specialists, builder (if appointed).

Final decisions used on every subject related to design, specification, development and cost. For a normal procurement process, development information is first well prepared in sufficient details to allow a tender or tenders to be obtained. Any further production information required under the building deal to complete the information for construction is then well prepared. All statutory approvals should be obtained by the end of this phase.

Prepare final production information i. e. drawings, schedules and technical specs.

Monitor performance against the eye-sight and KPIs for the project.

Traditional contract:

C to F - Detailed design and tender documentation produced

PFI/BSF agreement:

C to F - Discussions with preferred Bidder to finalise contract details.

Non sample designs well prepared in BSF

Partnering deal:

C to F - Last design developed jointly within budget constraints, most likely to a Agreed Maximum Price (AMP).

DESIGN

RIBA Level G

Tender documents; Expenses of Quantities

Architects, engineers and specialists. Service provider (if appointed)

Prepare and collate tender documentation in sufficient depth to allow a tender or tenders to be obtained for the structure of the Job. It ought to be noted that this Stage is much more highly relevant to Traditional varieties of procurement.

Prepare Charges of Amounts and sensitive documents

Monitor performance resistant to the eye-sight and KPIs for the project

Traditional contract:

G to H - Tendering process - company selected

PFI/BSF agreement:

G to H - PFI deal signed

LEP founded in BSF

Negotiations with service provider for future phases in BSF

Partnering deal:

G to H - Agreement signed

Maximum price (AMP) fixed

DESIGN

RIBA Stage H

Tender action

Architects, QS, designers, contractor, customer.

Prepare and complete all information and arrangements for obtaining tender(s). Identify potential contractors and/or specialists for the development of the task.

Tenders obtained and appraised with suggestions made to your client body or Steering Group to allow an appointment to be produced. It's important that the companies' knowledge of, and commitment to, the task vision and its sustainability is tested at this stage. This is achieved by the inclusion of this as a key selection criterion early in the procurement process.

Hold pre-tender briefing for potential companies to ensure they have a good task understanding

Obtain and appraise tenders

Appoint contractor

Monitor performance up against the perspective and KPIs for the job.

CONSTRUCT

CONSTRUCT

CONSTRUCT

RIBA Stage J

Project Planning; Mobilisation

(Site Operations)

Architects, QS, engineers, contractor, client

Building agreement let and company appointed

Production information issued to the contractor

Site is paid to the contractor

Take action relative to the RIBA Plan of Work

Appoint contractor

Hand over site to contractor to get ready prior to construction

Monitor performance from the perspective and KPIs for the task.

Traditional deal:

J to M - Development supervised by design team

PFI/BSF deal:

J to M - Development of first phase

Facilities Management (FM) service delivery commences on completion

Partnering contract:

J to M - Builder, design ream and client continue steadily to 'partner' to attain budget/programme

RIBA Stage K

Operations on Site; Construction to Practical Completion

(Site Operations)

Contractors, sub-contractors

Contractor programmes the work in accordance with the deal and commences work on site. The client or their representative - the architect in Traditional procurement - administers the building contract up to and including practical completion (this is the point at which the service provider hands back possession of the website and completed project to your client). More info supplied to the contractor as so when realistically required.

Take action relative to the RIBA Plan of Work

Regular site inspections of work to ensure it complies with specification.

Monitor performance against the eyesight and KPIs for the project

RIBA Stage L Completion

(Site Functions)

Architects, engineers, companies, sub-contractors, QS, client

This Level is clearly separated from the structure phase. Final inspections are made to ensure specs have been satisfied. In addition, the ultimate profile is settled

Take action in accordance with the RIBA Plan of Work

Monitor performance resistant to the perspective and KPIs for the project

USE

RIBA Level M Feedback

Architect, technicians, QS, contractor, client, users as appropriate

At this Level, the building has been handed over to your client for job. Any problems will have been remedied and the ultimate account settled. This enables the management, development and performance of the project to be assessed.

Analyse job information and check completed building(s) as appropriate.

Conduct studies of the building used. These are specifically important to concentrate on energy in use against the design specification.

Monitor performance resistant to the eye-sight and KPIs for the project.

The RIBA Periods conclude at Level M. For jobs to be lasting, the operational and decommissioning phases have to be separately determined and prepared for by your client. For PFI/BSF procurement, these will be the responsibility of the consortium.

 

 